Design of Paving, Grading, Drainage, and Pavement Marking and Signage for a new padel courts facility in Hollywood, Florida. The 1.80 acre site includes a Pro Shop, 5 covered courts, 4 opencourts, and on-site parking for 50 vehicles.
The drainage system is designed to maintain the peak stages from a 25-year / 3-day storm event onsite. It includes a combination of perimeter berms, swales and 1,000 LF of exfiltration trenches to capture, treat, and dispose of the runoff.
In partnership with 3Design Architecture (Architect of Record) and C. Right Studios (Landscape Architect).
We’re here to answer your questions, discuss your ideas, and bring your project to life.